Phillips Road Drainage Improvement Project

Phase Three photos (shown below) reveal that the modifications to the terrain on a stretch of Phillips Rd. has been completed. The tree stumps were removed during this Phase. Drainage trenches were dug and drain pipes along with stone were added to trench. Keep watching here for photos.

Phase Two photos (shown below) reveal that the modifications to the terrain on a stretch of Phillips Rd. has begun. Trees were removed along with shrubs as seen in afternoon and evening photos. Down trees and shrubs were then removed from the roadside on day two. The tree stumps left behind will be removed in Phase Three. Keep watching here for future photos and follow our progress.

DSCN0360.JPG
DSCN0361 (2).JPG
DSCN0363.JPG
DSCN0365.JPG
DSCN0364.JPG
DSCN0366.JPG
DSCN0367.JPG
DSCN0368.JPG
DSCN0369.JPG
DSCN0380.JPG
DSCN0379.JPG
DSCN0381 1 pm.JPG
DSCN0370.JPG
DSCN0371.JPG
DSCN0372.JPG
DSCN0376 (2).JPG
DSCN0378.JPG
DSCN0377.JPG
DSCN0388 (2).JPG
DSCN0392.JPG
DSCN0396.JPG
DSCN0389 (2).JPG
DSCN0391 (2).JPG
DSCN0393.JPG
DSCN0394 (2).JPG
DSCN0397.JPG
DSCN0400.JPG
DSCN0403.JPG
DSCN0416.JPG
DSCN0406.JPG
DSCN0420.JPG
DSCN0422.JPG
DSCN0425.JPG
DSCN0427.JPG
DSCN0428.JPG
DSCN0409.JPG
DSCN0421.JPG
DSCN0426.JPG
DSCN0433.JPG

Phase One shows (below) how snow and icy patches persistently cover the road. The constant shading of roadside trees and shrubs prevent the sun from assisting in the melting of snow and ice. Photos below show the need to have some modifications made on a stretch of Phillips Road to ensure travelers safety. 

0314191228-01.jpg
0314191227-01.jpg
0314191227-00.jpg
0314191226-02.jpg
0314191226-01.jpg
0314191224-01.jpg
0314191223-02.jpg
0314191223-01.jpg
0314191223-00.jpg
0314191221-02.jpg
0314191222-01.jpg
0314191221-00.jpg