Phillips Road Drainage Improvement Project

Phase Two photos (shown below) reveal that the modifications to the terrain on a stretch of Phillips Rd. has begun. Trees were removed along with shrubs. The tree stumps left behind will be removed in Phase Three. Keep watching here for future photos and follow our progress.

DSCN0360.JPG
DSCN0361 (2).JPG
DSCN0363.JPG
DSCN0365.JPG
DSCN0364.JPG
DSCN0366.JPG
DSCN0367.JPG
DSCN0368.JPG
DSCN0369.JPG
DSCN0380.JPG
DSCN0379.JPG
DSCN0381 1 pm.JPG
DSCN0370.JPG
DSCN0371.JPG
DSCN0372.JPG
DSCN0376 (2).JPG
DSCN0378.JPG
DSCN0377.JPG

Phase One shows (below) how snow and icy patches persistently cover the road. The constant shading of roadside trees and shrubs prevent the sun from assisting in the melting of snow and ice. Photos below show the need to have some modifications made on a stretch of Phillips Road to ensure travelers safety. 

0314191228-01.jpg
0314191227-01.jpg
0314191227-00.jpg
0314191226-02.jpg
0314191226-01.jpg
0314191224-01.jpg
0314191223-02.jpg
0314191223-01.jpg
0314191223-00.jpg
0314191221-02.jpg
0314191222-01.jpg
0314191221-00.jpg